To contact us:

     phone: 440.298.3232
     toll free: 800.536.3232
     fax: 440.951.1921
    
info@sidleyprecast.com

 
Sidley Precast Group
One company for all your Precast needs

Case Studies


                        
     

Airports
The Air Traffic Control Tower for the WV Air National Guard in Martinsburg, WV is a 10-story, 128 foot tall total precast structure. The geometry of the arch and inverted precast on the tower proved to one of the toughest challenges of the project, but one that was successfully overcome.

Architect: HSMM, Washington, DC
Contractor: Clark Construction Group, Inc., Bethesda, MD

Other Airport Projects:
        - Pittsburgh International Airport, Pittsburgh, PA
        - Port Columbus, Control Tower, Columbus, OH
        - 
Akron Canton Airport Deicing Facility, Akron, OH
Education
The New Springfield High School was built as part of Ohio
School Facilities Commission program. The new facility
replaces two existing high schools, with a capacity for
2,447 students. The building has precast concrete
insulated wall panels around the main three story
classroom wing.

Architect: Lesko Associates, Cleveland, OH
Contractor: Ruscilli/Kapp Construction, Springfield, OH

Other Education Projects:
        - Canal Winchester LSD, Grove City, OH
        - Warren G. Harding High School, Warren, OH
        - Kent State University Performing Arts Center
           New Philadelphia, OH
                        

  

Healthcare
The Lake Erie College of Osteopathic Medicine's [LECOM] new
Integrated Health and Wellness Center in Erie, PA, is due to open
January 2009. The three story state-of-the-art facility is 82,000
square feet and is clad in architectural precast wall panels
produced by Sidley Precast Group.

Architect & Contractor: Marshall Erdman & Associates
Madison, WI

Other Healthcare Projects:
        
- Cleveland Hearing & Speech Center, Cleveland, OH
        - CCF Center for Autism, Cleveland, OH
        - Western Maryland Health Center, Cumberland, MD

Manufacturing & Warehousing
Delphi-Packard in Vienna, OH has 193,000 square feet of manufacturing and office space. The facility has over 200 insulated wall panels and over 60,800 square feet of Precast components in all.

Architect: Osborne Engineering, Mentor, OH
Contractor: B&B Contractors & Developers, Inc.,
Youngstown, OH


Other Manufacturing & Warehousing Projects:
        
- SYSCO Food Warehouse, Cleveland, OH
        - 
IAMS Pet Food, Leipsic, OH
        - 
Pepsi Bottling Plant, Buffalo, NY
                       
 
  

Office Buildings
Avery Dennison's new four-story building includes 145,000 square
feet of office space and training center with 45,000 square feet
of research laboratories. Sidley Precast Group produced spandrels,
window panels and column covers totaling 47,000 square feet
of concrete or more than 415 pieces of precast concrete

Architect: ka Architecture, Cleveland, OH
Contractor: Duke Construction, Solon, OH

Other Office Projects:
        - Franklin Park Corporate Center II, Pittsburgh, PA
        - Landerbrook III, Mayfield, OH
        - Developers Diversified, Beachwood, OH

Parking Structures
The Morgantown Parking Authority turned to Precast when the revitalized Wharf District in Morgantown, WV was in need of a new Parking Garage. The $4 million four-story structure accommodates 316 vehicles. The garage's precast spandrels feature thin-set brick.

Architect: Burgess & Niple Architects, Parkersburg, WV
Contractor: Carl Walker Construction, Pittsburgh, PA


Other Parking Structure Projects:
        
- Cork Factory Parking Garage, Pittsburgh, PA
        - 
Crossroads Parking Garage, Washington, PA
        - 
UPMC Children's Research Facility Parking Garage,
          Pittsburgh, PA

Stadiums
The new Washington Nationals opened Spring 2008. The stadium is located along the Anacostia River waterfront in a new mixed-use entertainment district in our nation's capital. The ballpark is the first major stadium in the United States accredited as a "LEED-certified" environmentally friendly building.


Architect: HOK Sports, Inc., Kansas City, MO
Contractor: Clark, Hunt, Smooth Construction,
Washington, DC

Other Stadium Projects:
        
- Pittsburgh Penguins Arena, Pittsburgh, PA
        - Heinz Field, Pittsburgh, PA
        - Cleveland Browns Stadium, Cleveland, OH